Thungela's 2025 results reflect operational excellence and shareholder returns,
embedding resilience through the cycle
• Operated a fatality-free business for 3 consecutive years
• Group recorded export saleable production of 17.8Mt, exceeding guidance
• Adjusted operating free cash flow* of R396 million for the year and net cash* of
R5.1 billion at 31 December 2025
• Declaration of a final ordinary cash dividend of R2 per share, taking full year
dividend to R4 per share
• Annea Colliery and Zibulo North Shaft life-extension projects completed, ramp-
up in progress
Key performance metrics(1) 31 December 2025 31 December 2024 % change
(Rand million unless otherwise stated)
Export saleable production - South Africa 13,853 13,595 1.9
(kt)
Export saleable production - Ensham (on a 3,985 4,068 (2.0)
100% basis) (kt)
Revenue 29,599 35,554 (17)
(Loss)/Profit for the reporting period (7,107) 3,544 (301)
(Loss)/Earnings per share (cents/share) (5,464) 2,676 (304)
Headline (loss)/earnings per share (647) 2,559 (125)
(cents/share)
Dividend per share (cents/share) 400 1,300 (69)
Alternative performance measures*
Adjusted EBITDA 1,216 6,255 (81)
Adjusted EBITDA margin (%) 4.1 18 (14pp)
Adjusted operating free cash flow 396 3,589 (89)
Net cash 5,054 8,671 (42)
Capital expenditure (3,087) (3,396) (9.1)
FOB cost per export tonne excluding royalties 1,170 1,130 3.5
- South Africa (Rand/tonne)
FOB cost per export tonne excluding royalties 1,435 1,433 —
- Ensham (Rand/tonne)
(1) The Group's financial results and operational performance for Australia reflect the results of the Ensham Business at 100% of the
operations from 28 February 2025. Prior to this date, the results for the Ensham Business are reflected at 85%.
MESSAGE FROM MOSES MADONDO, CHIEF EXECUTIVE OFFICER
Our 2025 results demonstrate another year of strong operational performance,
highlighting our ability to control the controllables in a challenging thermal coal
market environment. As I reflect on my time since joining Thungela, I am inspired by
our people and the strong culture that is grounded in our values of safety, care and
respect, accountability, excellence, agility and entrepreneurship.
The ongoing conflict in the Middle East following the recent US-Israeli actions
involving Iran has raised new levels of uncertainty and has understandably caused
concern, not only for the global economy but for peace, safety and security in the
region. We are providing support to our colleagues in Dubai, prioritising their safety
and well-being. The uncertainty brought about by the conflict has, once again,
increased volatility in the energy market, impacting on the price of oil, gas and coal.
We will continue to closely monitor the situation and the impact on our employees
and operating environment.
Safety remains at the core of everything we do, ensuring that all our people return
from work, safe and healthy each day. I am pleased to report that we have operated
for three years without a loss of life. Our unwavering zero-harm mindset is guided by
three critical focus areas – risk management, effective work management and a
safety culture. The Group's total recordable case frequency rate increased to 2.83,
from 1.93, primarily due to the challenging operating environment during the
production footprint transition. As a result, we have implemented targeted
interventions for increased risk sections and work crews through leading indicator
heatmaps.
Looking at our operational performance, we achieved or exceeded export saleable
production guidance. In South Africa, we recorded export saleable production of
13.9Mt, exceeding the production guidance of 12.8Mt to 13.6Mt, reflecting strong
performance at Mafube and the ramp-up at the Annea Colliery (previously known as
the Elders project). In Australia, we overcame the challenging geological conditions
of the first half of the year to deliver export saleable production of 4.0Mt, which was
at the upper-end of the guidance range of 3.7Mt to 4.1Mt.
We have made meaningful progress in reshaping our business, enhancing
operational flexibility and embedding resilience through the commodity cycle. The
Annea Colliery and the Zibulo North Shaft life-extension projects were successfully
delivered on time and within budget. Together with the advancement of the
Lephalale Coal Bed Methane (LCBM) project and the disposal of assets, aimed at
optimising our portfolio and further strengthening the balance sheet, this
underscores our ability to execute on our strategic priorities.
Driving our ESG aspirations
Environmental, social and governance (ESG) remains fundamental to our strategy
and operations. As a responsible environmental steward, we are committed to
reducing scope 1 and 2 emissions by 30% by 2030, against a 2021 baseline, and to
reach net zero by 2050. We are pleased to report that, in 2025, we recorded zero
level 3 to 5 environmental incidents – the first time since listing in 2021.
Complementing these efforts, our socio-economic development investments remain
integral to our purpose. The Thungela Education Initiative and the enterprise and
supplier development programme, Thuthukani, continue to deliver measurable and
meaningful benefits to schools and suppliers within host communities. The education
programme aims to strengthen school leadership, enhance teaching capacity and
provide psychosocial and learner support. Together, these programmes demonstrate
our dedication to creating long-lasting, sustainable value for our stakeholders and
helping to build communities that thrive beyond the life of our mines.
Our performance
In 2025, we delivered robust operational performance, supported by continued
productivity gains and disciplined cost management. The Group recorded export
saleable production of 17.8Mt, approximately 175kt higher than the output achieved
in 2024. In South Africa, the free on board (FOB) cost per export tonne excluding
royalties* of R1,170 was below the guidance range of R1,210 to R1,290, highlighting
the productivity improvements and cost efficiency initiatives, partially offsetting the
impact of inflation and operational transition costs. At the Ensham Mine, the FOB cost
per export tonne excluding royalties* of R1,435 was also below the guidance range of
R1,470 to R1,580, demonstrating the improved productivity and disciplined
cost management.
Transnet Freight Rail (TFR) rail performance improved to 56.8Mt, compared to
51.9Mt in 2024. We recognise the tangible improvements achieved to date, through
collaborative efforts between Transnet, the National Logistics Crisis Committee and
the coal industry. Strengthening the coal logistics system benefits the broader
industry, supporting both established producers and emerging participants, while
reinforcing South Africa's position in global coal markets.
The Group reported revenue of R29.6 billion, a 17% decline compared to 2024,
driven by lower benchmark coal prices and foreign exchange movements that
resulted in a stronger South African rand relative to a weaker US dollar. Our South
African operations achieved an average realised export price of R1,336 per tonne, a
decrease of 20% compared to 2024. The Ensham Business achieved an average
realised export price of R1,877 per tonne, which was 17% lower than in 2024.
The Group recognised non-cash impairment losses of R8.8 billion against our assets,
reflecting lower benchmark coal price forecasts, the weakening of the US dollar and
the strengthening of the South African rand. The impairment losses are non-cash in
nature and do not affect the Group's liquidity or operational capacity.
The Group generated adjusted EBITDA* of R1.2 billion and incurred a net loss of
R7.1 billion for the year, impacted by the non-cash impairment losses. Despite the
challenging market conditions, the Group generated R2.4 billion in cash flows from
operating activities during the year. After investing R2.0 billion in sustaining capital*,
the Group remained free cash flow positive, generating adjusted operating free cash
flow* of R396 million for the year. The net cash* at 31 December 2025 was
R5.1 billion.
Portfolio optimisation in South Africa
We have remained focused on delivering on our strategic priorities. The Annea
Colliery was developed to replace production from the Goedehoop Colliery and,
as part of this transition, a number of employees and relevant equipment from
Goedehoop Colliery have been successfully redeployed to Annea Colliery. This
ensures continuity of skills and operational capability. The Zibulo North Shaft life
extension project was completed and formally handed over to the operational team,
with production ramp-up underway.
Our South African portfolio has continued its transition with the closure of the
Goedehoop North and Isibonelo mines, where remaining coal reserves have reached
the end of their economic lives. The Isibonelo mine, which supplied its production
under a long-term domestic coal supply agreement, ceased operations in December
2025 following the conclusion of the contract. The mine has since transitioned into
care and maintenance.
In line with our portfolio optimisation strategy, we have initiated a disposal programme
for assets where remaining resources and infrastructure retain value in use but no
longer provide optimal long-term economic benefit to the Group. At the end of 2025,
we announced the sale of Goedehoop North and we have also concluded an
agreement for the disposal of the Kleinkopje mining right at the Khwezela Colliery.
These transactions include the transfer of remaining resources and associated
infrastructure. The rehabilitation liabilities attributable to the areas being sold will
transfer to the purchasers upon the completion of each transaction, which is expected
in 2026. This showcases our ability to successfully execute on our strategic priorities,
ensuring that we reshape our business and entrench resilience through the cycle.
We have made progress on the LCBM project. The modular liquefied natural gas
demonstration plant is designed to validate the commercial viability and marketability
of the resource. Once commissioned, the plant will supply gas to a generator at the
Annea Colliery, enabling the operation to partially offset its reliance on Eskom
electricity. Commissioning is expected to be completed during the first half of 2026.
Thermal coal market dynamics
Global economic activity remained subdued in 2025, shaped by the ongoing effects of
geopolitics, trade tariffs and volatility in international trade. Rising inflationary
pressures, shifts in economic sentiment and fluctuating financial markets further
constrained global growth. Within this context, the strengthening of the South African
rand placed additional pressure on the competitiveness of the country's export
sectors.
The seaborne thermal coal market remained depressed for much of the year, largely
due to weak demand in key coal-consuming countries. In China and India, seaborne
demand fell short of expectations, as both countries continued to expand domestic
production and accelerate investment in alternative energy sources. In Japan, Korea
and Taiwan, higher utilisation of gas and nuclear power further reduced coal imports,
contributing to sustained downward pressure on the Newcastle Benchmark coal
price. Following a prolonged period of low benchmark coal prices across South Africa
and Australia in 2025, the market experienced a moderate recovery towards the end
of the year. This improvement was driven by restocking at major import hubs and
increased demand from the Indian sponge iron market, which provided support for
South African export coal.
On the supply side, sustained production levels from Indonesia, Australia and South
Africa from late 2024 and throughout 2025 created an imbalance and the market
could not fully absorb the increased supply throughout the year. We observed a level
of supply discipline in Colombia, where production was curtailed due to the ongoing
low coal price environment coupled with higher freight differentials. However, the
supply discipline that was expected has not yet fully materialised.
According to the International Energy Agency (IEA), coal continues to be a reliable
and affordable source of energy, supplying roughly a third of global electricity, and
remains an integral component of energy security as the energy transition
progresses. The IEA further notes that many countries are adopting a pragmatic
approach that balances ongoing coal use with the deployment of emerging
low-carbon technologies. Similarly, the World Economic Forum emphasises that
energy transitions in emerging and developing economies must safeguard energy
security and economic stability.
Premature or abrupt phase-out of coal risks electricity shortages, rising energy costs
and socio-economic disruption, particularly for communities dependent on mining and
related industries. Coal continues to underpin affordable electricity, support industrial
and infrastructure development and enable economic growth.
Commitment to the capital allocation framework
Our capital allocation framework remains central to our strategy and we prioritise
returns to shareholders through the cycle. In 2025, we returned R2.2 billion to
shareholders through a combination of cash dividends and share buybacks. During
the year, we completed two share buybacks for a total consideration of R469 million,
or 4,858,231 shares, which represented 3.5% of issued share capital.
We continued to invest through the cycle, deploying R747 million in 2025 to complete
the life extension projects. To date, we have invested a total of R4.2 billion in the
Annea Colliery and Zibulo North Shaft, as well as R382 million on the LCBM project,
to position the business for long-term competitiveness and value creation. The Group
is not currently reserving cash to complete future capital expenditure commitments,
as key life-extension projects in South Africa are now substantially complete.
A key element of our capital allocation framework is the cash collateralisation of our
environmental liabilities. In South Africa, we contributed R203 million to the green
fund and, in Australia, we made an additional R275 million contribution to an
investment vehicle with a similar purpose.
The Group's dividend policy is to distribute a minimum of 30% of adjusted operating
free cash flow*. In the first half of the year, the Group generated adjusted operating
free cash flow* of R484 million, however, in the second half of the year, we incurred
negative adjusted operating free cash flow* of R88 million. This required the board to
exercise its discretion in determining an appropriate ordinary cash dividend under the
current circumstances.
The board remains committed to prioritising shareholder returns where the balance
sheet allows for it and where the future prospects of the Group remain supportive of
such a distribution. Accordingly, the board has approved a final dividend of R2 per
share, or R281 million. Together with the interim dividend of R2 per share, or
R281 million, and the R139 million share buyback completed following our interim
results, this brings total shareholder returns relating to 2025 performance to
R701 million, representing 177% of adjusted operating free cash flow*.
The Sisonke Employee Empowerment Scheme and the Nkulo Community
Partnership Trust will receive a further R31 million collectively, in addition to the
interim contribution of R31 million.
These distributions result in the Group maintaining a cash buffer of approximately
R4.7 billion, which the board considers to be appropriate given the current market
environment. In addition, the Group holds undrawn credit facilities of R3.2 billion.
Looking ahead
In 2026, our immediate priorities remain clear: safety, operational excellence and
capital allocation.
We remain committed to operating a fatality-free business while further
strengthening our safety performance through our targeted interventions and by
reinforcing our safety culture.
We continue to focus on controlling the controllables and driving operational
excellence through productivity improvements and cost efficiency. These efforts will
be supported by the successful ramp-up of the Annea Colliery and Zibulo North
Shaft. On the LCBM project, we will continue to validate the commercial viability and
marketability of the resource.
Thungela's capital allocation framework remains a cornerstone of our strategy and
prioritises maintaining balance sheet resilience, ensuring the long-term sustainability
of our assets, by investing through the commodity cycle, while also prioritising
returns to shareholders. We continue to review our strategy to ensure that we deliver
on our purpose – to responsibly create value together for a shared future.
I look forward to leading this great organisation with energy, ambition and
confidence. Our people remain at the heart of everything we achieve – our future is
anchored in the choices we make to shape the future we want.
OPERATIONAL GUIDANCE – 2026
South Africa Ensham
Export saleable production (Mt) 13.0 – 13.6 3.9 – 4.2
FOB cost per export tonne* (Rand/tonne) 1,330 – 1,380 1,650 – 1,740
FOB cost per export tonne excluding royalties* (Rand/tonne) 1,320 – 1,370 1,480 – 1,570
Capital – sustaining* (Rand million) 700 – 1,000 500 – 700
Capital – expansionary (Rand million) 100 nil
South African operations
Export saleable production guidance for 2026 of 13.0Mt to 13.6Mt reflects the
changes in our production footprint, coupled with an expectation of further
improvements in TFR performance.
Our production footprint is in transition. The Annea Colliery continues to ramp-up and
is expected to reach steady state production run rates in 2026 – replacing volumes
from Goedehoop following its closure at the end of 2025. Zibulo North is also in
ramp-up and is expected to reach steady state production run rates in 2027, while
2026 will be the final year for the Zibulo opencast operation. Production in 2027 is
expected to be broadly in line with 2026.
FOB cost per export tonne excluding royalties* is expected to be between R1,320
and R1,370, in line with previous guidance assumptions adjusted for inflation. The
equivalent cost including royalties is expected to be between R1,330 and R1,380 per
tonne.
Sustaining capital expenditure* is expected to range between R700 million and
R1.0 billion. Expansionary capital expenditure of approximately R100 million
is expected in 2026, primarily related to completion activities at the Zibulo North
Shaft.
Ensham
Export saleable production guidance for 2026 is 3.9Mt to 4.2Mt. The mine has a
more stable operating base and is now better equipped to traverse geological faults,
while we have also made good progress on improving productivity. Production in
2027 is expected to be broadly in line with 2026 levels.
FOB cost per export tonne excluding royalties* is expected to be between R1,480
and R1,570 in 2026. The equivalent cost including royalties is expected to range
between R1,650 and R1,740 per tonne.
Sustaining capital expenditure* at Ensham is expected to be between R500 million
and R700 million.
DIVIDEND DECLARATION
The board has declared a final ordinary cash dividend of R2 per share, payable to
shareholders on the Johannesburg Stock Exchange and the London Stock
Exchange in April 2026 and May 2026, respectively.
Further details regarding the dividend declaration can be found in a separate
announcement dated 23 March 2026 on the Johannesburg Stock Exchange News
Services (SENS) and the London Regulatory News Services (RNS).
FORWARD-LOOKING STATEMENTS
This announcement includes forward-looking statements. All statements included in
this document (other than statements of historical facts) are, or may be deemed to
be, forward-looking statements, including, without limitation, those regarding
Thungela's financial position, business, acquisition and divestment strategy, dividend
policy, plans and objectives of management for future operations (including
development plans and objectives relating to Thungela's products, production
forecasts and resource and reserve positions). By their nature, such forward-looking
statements involve known and unknown risks, uncertainties and other factors which
may cause the actual results, performance or achievements of Thungela, or industry
results, to be materially different from any future results, performance or
achievements expressed or implied by such forward-looking statements. Thungela
therefore cautions that forward-looking statements are not guarantees of future
performance.
Any forward-looking statement made in this announcement or elsewhere is
applicable only at the date on which such forward-looking statement is made. New
factors that could cause Thungela's business not to develop as expected may
emerge from time to time and it is not possible to predict all of them. Further, the
extent to which any factor or combination of factors may cause actual results to differ
materially from those contained in any forward-looking statement are not known.
Thungela has no duty to, and does not intend to, update or revise the forward-
looking statements contained in this announcement after the date of this document,
except as may be required by law. Any forward-looking statements included in this
announcement have not been reviewed or reported on by the Group's independent
external auditor.
Investors are cautioned not to rely on these forward-looking statements and are
encouraged to read the Annual Financial Statements for the year ended 31
December 2025 (Annual Financial Statements 2025), which are available from the
Thungela website via the following web link:
https://www.thungela.com/investors/financial-results
ALTERNATIVE PERFORMANCE MEASURES
Throughout this results announcement, a range of financial and non-financial
measures are used to assess our performance, including a number of financial
measures that are not defined or specified under International Financial Reporting
Standards (IFRS Accounting Standards), which are termed 'alternative performance
measures' (APMs). Management uses these measures to monitor the Group's
financial performance alongside IFRS Accounting Standards measures, to improve
the comparability of information between reporting periods. These APMs should be
considered in addition to, and not as a substitute for, or as superior to, measures of
financial performance, financial position or cash flows reported in accordance with
IFRS Accounting Standards. APMs are not uniformly defined by all companies,
including those in the Group's industry. Accordingly, these measures may not be
comparable with similarly titled measures and disclosures by other companies. In
this results announcement, APMs are denoted with an asterisk (*).
RESULTS ANNOUNCEMENT
This results announcement, including the forward-looking statements, is the
responsibility of the directors of Thungela.
Shareholders are advised that this results announcement is only a select extract of
the information contained in the Annual Financial Statements 2025 and does not
contain full or complete details. Any investment decisions by investors and/or
shareholders should be based on a consideration of the full Annual Financial
Statements 2025 as a whole and investors and/or shareholders are encouraged to
review the Annual Financial Statements 2025, which are available on the Thungela
website via the following web link: https://www.thungela.com/investors/financial-
results, and available on the JSE's cloudlink, at
https://senspdf.jse.co.za/documents/2026/JSE/ISSE/TGAE/TGAFY2025.pdf
This results announcement has been prepared in compliance with the JSE Limited
Listings Requirements.
A conference call and webcast relating to the details of this results announcement
will be held at 12:00 SAST (10:00 GMT) on Monday, 23 March 2026. Registration
details for the conference call and webcast are below:
Conference call:
https://services.choruscall.it/DiamondPassRegistration/register?confirmationNumber
=7721589&linkSecurityString=160b7e901e
Webcast:
https://78449.themediaframe.com/links/thungela260323.html
The consolidated financial statements for the year ended 31 December 2025 were
audited by PricewaterhouseCoopers Inc. who have issued an unqualified audit opinion
thereon. The full independent auditor's report and Annual Financial Statements 2025
are available for viewing on the Thungela website via the following web link:
https://www.thungela.com/investors/finacial-results.
This results announcement has not been audited or reviewed by the Group's
independent external auditor. Any reference to future financial performance included
in this announcement has not been separately reported on by the Group's
independent external auditor.
The Company's registered office is located at: 25 Bath Avenue, Rosebank,
Johannesburg, 2196, South Africa.
The information contained within this announcement is deemed by the Company to
constitute inside information as stipulated under the market abuse regulation (EU) no.
596/2014 as amended by the market abuse (amendment) (UK mar) regulations 2019.
Upon the publication of this announcement via the regulatory information service, this
inside information is now considered to be in the public domain.
On behalf of the board of directors
Sango Ntsaluba, Chairperson
Moses Madondo, Chief executive officer
Johannesburg, South Africa
Date of SENS release: 23 March 2026
Investor relations
Hugo Nunes or Shreshini Singh
Email: ir@thungela.com
Media
Hulisani Rasivhaga
Email: hulisani.rasivhaga@thungela.com
UK Financial adviser and corporate broker
Panmure Liberum Limited
Tel: +44 20 3100 2000
Sponsor
Rand Merchant Bank
(A division of FirstRand Bank Limited)
Tel: +27 11 282 8000
Date: 23-03-2026 09:00:00
Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE').
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct,
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
information disseminated through SENS.