Wrap Text
Rietberg Mine Development reaches main ore zone with initial bulk sampling supporting mine plan grade
COPPER 360 LIMITED
Incorporated in the Republic of South Africa
(Registration number 2021/609755/06)
Share code: CPR
ISIN: ZAE000318531
(“Copper 360” or “the Company”)
RIETBERG MINE DEVELOPMENT REACHES MAIN ORE ZONE WITH INITIAL BULK SAMPLING SUPPORTING MINE PLAN GRADE
Shareholders are referred to the announcement of 15 October 2026, in which Copper 360 reported that the incline at the Rietberg
underground mine had intersected copper sulphide mineralisation ahead of the known Upper Orebody. The Company is pleased to
advise that, after reaching the 300 Level (300L) elevation, development continued towards the main ore zone, which was intersected
on 9 November 2026. To date the development has advanced 9 metres within the mineralised mafic rocks.
Initial bulk sampling indicates a grade of about 1.9% total copper (TCu) for the ore mined to date, once the footwall waste and low-
grade material mined with it are taken into account. This compares with the grade of 1.33% Cu in the Company’s mine plan. These are
first results from a small tonnage and should be read with the cautionary note below.
Intersection and development
After the incline reached the 300L elevation, an exploration breakaway was developed towards the main ore zone on a bearing of 010°
(NNE) at an incline of 9°. The ore zone was intersected on 9 November 2026 and is hosted in the mafic rocks of the Koperberg Suite.
The ore enters the excavation from the hanging wall, so the first blasts were only partly in ore: ore made up between about one-third
and one-half of the face, with footwall waste making up the balance. The proportion of ore in the face is expected to increase with
each blast as the breakaway advances.
Sampling and results
A total of 671.5 tonnes of material from the breakaway was processed through the crusher. It consisted of an estimated 143.7 tonnes
of ore, 202.6 tonnes of footwall waste and 325.2 tonnes of low-grade material from the breakaway. Six samples taken at the crusher
returned grades of between 0.25% and 0.75% Cu, averaging 0.50% Cu for the diluted material.
Grade is estimated at 1.9% Cu, within a range of 1.3% to 2.3% Cu. Five samples of exposed ore taken at the face and from the stockpile,
without dilution, were analysed by XRF and returned grades of between 1.80% and 3.23% Cu, averaging 2.31% Cu. The two nearest
historical boreholes, RB239 and RB240, have weighted average sample grades of 1.35% and 1.66% Cu respectively.
Initial sampling results from the exploration breakaway
Sample set Basis Grade (% Cu)
671.5 t: ore 143.7 t, footwall waste 202.6 t,
Material crushed (bulk sample) –
low-grade material 325.2 t
Crusher samples – diluted material 6 samples (S1906 to S1911); range 0.25% to 0.75% Cu 0.50
Footwall waste at 0.00% Cu and low-grade material at
Ore portion – back-calculated 1.9
0.20% Cu; range 1.3% to 2.3% Cu
5 samples (S1912 to S1916) from the face and stockpile;
Exposed ore – undiluted (XRF) 2.31
range 1.80% to 3.23% Cu
Historical borehole RB 239 Weighted Average of 35 samples 1.35
Historical borehole RB 240 Weighted Average of 19 samples 1.66
Mine plan grade Grade used in the Company’s mine plan and forecast 1.33
Further assay results are outstanding, and each blast will continue to be sampled as the development advances.
Comparison with the mine plan
The ore grade of 1.9% Cu is 43% higher than the grade of 1.33% Cu used in the Company’s mine plan. The lower end of the calculated
range, 1.3% Cu, is in line with the mine plan grade, and the averages of the two nearest historical boreholes (1.35% and 1.66% Cu) are
at or above it. On the evidence to date, the grade assumed in the Company’s forecast is supported by what has been mined.
Cautionary note on these initial results
Shareholders should note that these are initial results from the first metres of development in the ore zone. The ore grade is a back-
calculation that depends on the estimated tonnes of ore, footwall waste and low-grade material in the crushed parcel, and the material
as crushed averaged 0.50% Cu because of that dilution. The XRF results on exposed ore are indicative and are not laboratory assays. A
representative view of the grade will only be available after a few months of mining, when production can be reconciled against the
geological model. The results do not change the Company’s Mineral Resource or Mineral Reserve estimates.
Mine plan
The results do not change the Company’s mine plan. Development will continue at the recommended 9° incline, and the footwall waste
dilution is expected to decrease as the face moves fully into ore.
Comment from the Chief Executive Officer
Gordon Thompson, CEO of Copper 360, said:
“After reaching the 300 Level elevation we kept developing towards the main ore zone, and this week we intersected it. We have now
advanced 9 metres within the mafic and ultramafic zone, and the first bulk sample indicates that the 1.33% copper grade in our model
is realistic. The ore grade we calculate from the sample is higher than the model grade, which gives us confidence in our forecast.
These are initial results. Only after a few months of mining will we have a representative picture of the grades. Even so, with the footwall
waste dilution taken into account, what we have seen so far is very encouraging.
I thank the development crews, geologists, engineers and support staff at Rietberg for getting us here safely.”
Competent Person statement
The sampling results presented in this announcement have been reviewed and approved by Dr Deon Vermaakt, PhD, an Independent
Competent Person, registered with the South African Council for Natural Scientific Professions (SACNASP), registration number
400020/00.
Dr Vermaakt has sufficient experience relevant to the style of mineralisation and type of deposit under consideration to qualify as a
Competent Person as defined in the SAMREC Code.
Dr Vermaakt consents to the inclusion of the information in this announcement in the form and context in which it appears.
STELLENBOSCH
16 November 2026
Designated Advisor: Bridge Capital Advisors Proprietary Limited
Date: 16/11/2026 02:14:00
Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE').
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct,
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
information disseminated through SENS.